en.m.wikipedia.org
Tafila Wind Farm
Tafila Wind Farm is a 117 MW wind farm located in Tafilah Governorate, Jordan. The farm consists of 38 turbines and was inaugurated in December 2015 by King Abdullah II. The project, which cost $287 million, is the first wind farm in the Kingdom and the region.[1] The venture aims to diversify energy resources in Jordan and boost the renewable energy contribution in the total energy mix.[2]
Tafila Wind Farm
CountryJordan
LocationTafilah Governorate
Coordinates30.7005°N 35.6783°E
StatusOperational
Construction began2013
Commission date2015
Construction cost$287 million
Owner(s)Jordan Wind Project Company
Operator(s)Vestas
Wind farm
TypeOnshore
Rotor diameter112 meters
Rated wind speed12 m/s
Site elevation1400-1700 m
Power generation
Units operational38
Make and modelVestas V112-3MW
Nameplate capacity117 MW
Annual net output400 GWh
External links
Website
www.jordanwind.com
CommonsRelated media on Commons
Gallery
See also
References
  1. ^ "King inaugurates Tafila Wind Farm Project". Jordan News Agency (Petra). 17 December 2015. Archived from the original on June 12, 2018. Retrieved 2016-10-14.
  2. ^ "الملك يدشن مشروع رياح الطفيلة (صور)". وكالة عمون الاخبارية. 17 December 2015. Retrieved 2016-10-14.

This article about a wind farm is a stub. You can help Wikipedia by expanding it.
This article about a building or structure in Jordan is a stub. You can help Wikipedia by expanding it.
Last edited on 29 September 2019, at 21:53
Content is available under CC BY-SA 3.0 unless otherwise noted.
Privacy policy
Terms of Use
Desktop
HomeRandomNearbyLog inSettingsDonateAbout WikipediaDisclaimers
LanguageWatchEdit